Re-roofs, repairs, new builds — complex scope, tight margins. Quote accurately without spending your weekend on it.
Every roofer faces these same challenges. You're not alone.
Every roof is different pitch, different size, different access. Measuring and calculating materials takes forever and mistakes are expensive.
Jobs get delayed by weather, crews need rescheduling, clients need updates. Manual scheduling falls apart when it rains.
Site plans, safety briefings, insurance docs — the safety paperwork keeps growing but there's no system to manage it efficiently.
Custom flashings, specific colours, sheet lengths — roofing materials have long lead times that need pipeline planning.
Six powerful tools designed specifically for trades like yours.
Full re-roof 180sqm coloursteel — all sheets, flashings, downpipes calculated from your supplier rates with waste factors included.
Example: 180sqm house re-roof: long-run coloursteel, new flashings, gutters, downpipes, remove old iron. All materials calculated. Total: $32,000.
Can't answer phone on a steep roof? ArcVoice takes details, assesses urgency (leak vs planned), and books inspections safely.
Example: Installing sheets on 45° roof when leak call comes in. ArcVoice determines urgency (heavy rain expected), books emergency inspection for 5pm today.
See every roofing job status — quoted, materials ordered, delivery scheduled, installation planned, weather holds, completion dates.
Example: Project view: Wilson re-roof (materials arriving Tuesday, install Wednesday if fine), Smith repair (quoted, awaiting approval), Jones new build (frames ready).
Re-roof decisions take time and research. Professional follow-up keeps your quote current while clients get other quotes and plan timing.
Example: $32k re-roof quote sent. ArcChase follows up: day 3 (questions?), day 7 (material samples), day 14 (pricing hold notice).
Re-roofs vs repairs vs new builds, tile vs steel vs membrane — know which roofing work delivers the best margins.
Example: Profit analysis: Re-roofs 16% margin, Repairs 28% margin, New builds 12% margin. Steel roofs more profitable than tile conversions.
Quote approved → materials ordered with lead times → crew scheduled → weather contingencies planned → client gets realistic timeline.
Example: Re-roof approved → coloursteel ordered (3-week lead time) → crew scheduled for delivery + 2 days → weather backup dates included → client timeline confirmed.
From job description to quote sent in under a minute.
Quick voice note or text description of what needs doing.
"Full re-roof 180sqm coloursteel long-run, new flashings and downpipes. Remove existing iron."
AI pulls from your price books and calculates everything automatically.
Professional quote appears in Fergus, ready to send to client.
One click sends a professional quote with your branding.
Seamless integration with the tools you already use.
Common questions about WorkArc automation for roofing businesss
Join hundreds of roofers who've already transformed their business with WorkArc.
15-minute call • No obligation • See it work with your jobs